Applies to:
Dream Report version 3.42 and older. |
||
|
||
Summary:
How to purge a Dream Report Database with a stored procedure. |
||
|
||
Details:
With Dream Report versions older than 3.42 the database limit management does not work properly. And with the version 3.42 it works only if you select the option “one table per day”. To be sure that the database is well managed the solution is to do it yourself. For an example of how to do this follow the instructions, in the form of a small project and tutorial, below. Download attachments: Purge_Base_DR_SQL.zip |
||
|
||
|
Created on: 10 Dec 2010 Last update: 13 May 2024